“Epoxyprimer” – Universal Water-Based Two-Component Epoxy Floor Primer
$35.12
$69.53
Freshly made surfaces (screeds/ concrete / cements): Allow the surface to mature for at least 4 weeks and make sure that no additives such as waxes and silicones have been used in the finishing layer. Scrape off any non-adhered lumps and dust well with a vacuum cleaner.Check that the floor is dry and that there are no signs of capillary moisture rising from the subfloor. The application is not recommended with relative humidity above 15%. To improve the anchoring of the epoxy, it is advisable to treat the substrate with a 10% solution of muriatic acid, leaving it to act until the typical bubbles on the surface are no longer visible. Then rinse thoroughly with water and allow to dry completely before proceeding to application.Already painted surfaces: Carefully check the rising humidity as in the case of new surfaces (see humidity specified above). Carefully remove any greasy and greasy stains. These must be removed with suitable detergents. Rinse immediately.On particularly dusty substrates or floors with obvious chalking of the substrate, a preventive consolidating treatment is recommended by applying a specific water primer.In the case of floors already in use, which are particularly dirty, it is advisable to treat the surface with a solution of muriatic acid as described above. In case of imported rising humidity, our team is available to advise you (contact section).In case of damaged/irregular floors (cracks or missing parts)first make any grouting with Epoxy Putty – MAGELSTIC
• Floors